Crosby Marine Lake to Formby Point coastal defence strategy study: Part 1 preliminary studies Report EX 4496 August 2002

by Sefton Metropolitan Borough Council Technical Services; H R Wallingford.
Material type: materialTypeLabelBookPublisher: UK H R Wallingford Ltd 2002ISBN: SE00012631; SE00012631.Classification number: 551.36 SEF; C551.36
Star ratings
    Average rating: 0.0 (0 votes)

Report commissioned by Sefton MBC whose representative was Graham Lymbery 0151 934 4238

Strategy study will eventually consist of 4 parts.Part 2 will not be available until Nov 2002 & the other parts 2003 & 2004.

There are no comments on this title.

to post a comment.